The electrical, low voltage and plumbing are in place. Following a successful electrical inspection, insulation was the next item on the list. As you can see from the pictures below, the walls and ceilings are insulated and the vapor barrier has been installed. The guys also got a nice start on the drywall. The tongue and grove pine paneling on the vaulted ceiling will be next. It looks like the date on the camera is wrong. I sure hope it's not June already.
No comments:
Post a Comment