Sunday, November 22, 2009

Part 8 -The Floor is On

After a hectic week of work the building is capped off.

Here's a summary of what was accomplished this week. Pretty impressive:
  • Hole dug
  • Septic tank and drain field installed
  • Well drilled
  • Footings framed and poured
  • Crawl space framed
  • Basement beam installed
  • Floor joist installed
  • Floor capped off
  • Tar applied to exterior of crawl space
I'm sure that I'm missing a bunch of stuff, but that's a pretty nice list for the first week.