After a hectic week of work the building is capped off.
Here's a summary of what was accomplished this week. Pretty impressive:
- Hole dug
- Septic tank and drain field installed
- Well drilled
- Footings framed and poured
- Crawl space framed
- Basement beam installed
- Floor joist installed
- Floor capped off
- Tar applied to exterior of crawl space
I'm sure that I'm missing a bunch of stuff, but that's a pretty nice list for the first week.